In this era of intensified climate change, urban flood prevention work is facing unprecedented challenges. Beijing Zhongke Blue Electric Technology Co., Ltd., as a high-tech enterprise deeply engaged in the fields of radar and signal processing, has launched its core products - radar flowmeter, radar flowmeter, and radar water level gauge, building a solid "smart defense line" for urban flood prevention.
Technology leads, innovation is infinite
Zhongke Blue Electric logarithmic radar flowmeter integrates modern information technologies such as the Internet of Things, big data, and cloud computing to build a comprehensive and three-dimensional urban flood control monitoring and early warning system. The system can monitor key data such as water level and flow rate in real time, providing scientific basis for flood control decision-making and significantly improving the emergency response capability and management level of the city. Its characteristics include:
Technological leadership: Supports 26G high-frequency operating frequency points, compatible with multiple protocols such as SDI-12 and 485, ensuring accurate and efficient data acquisition.
Design innovation: Adopting waveguide and lens antenna design, effectively preventing dust intrusion, especially suitable for complex outdoor environments; Frequency modulation continuous wave measurement technology improves the accuracy of water level measurement to ± 1 millimeter.
Durable and sturdy: With a fully enclosed waterproof design, it is not afraid of wind and rain, ensuring long-term stable operation of the equipment.
Intelligent and convenient: Built in automatic calculation function, providing real-time traffic results, simplifying the operation process, and improving work efficiency.
The use of Zhongke Blue Electric logarithmic radar flowmeter aims to provide users with a simple and efficient water monitoring solution. The following are the detailed steps for its usage:
Preparation before installation
Site selection: Choose a location with stable water flow, no obvious eddies or backflow, away from strong electromagnetic interference sources and areas prone to flooding, ensuring a wide and unobstructed view. At the same time, it should be avoided to install in locations with water level drops, turbulent water surfaces, as well as places with a lot of floating objects, eddies, and aquatic plants.
Equipment inspection: Confirm that the equipment inside the packaging box is intact and all components are complete. Check the integrity of the equipment and prepare the necessary tools for installation.
equipment installation
Installation bracket: Determine the installation height based on measurement requirements and actual conditions. It is generally recommended to install at a height of 3-4 meters to ensure that radar waves cover the water surface and avoid affecting signal quality. Secure the installation bracket firmly.
Equipment fixation: Install the logarithmic radar flowmeter on the bracket, ensuring stable installation and correct sensor orientation. The installation position of the sensor should ensure that the beam direction is opposite to the direction of the river, that is, the slope must face the direction of the water flow.
Connecting lines
Signal transmission: Connect signal transmission cables and other lines to ensure smooth data transmission.
Debugging and Configuration
Initial debugging: After installation is completed, debug to ensure that the device is running normally. This includes checking whether the equipment is stable and whether the data is accurate.
Software configuration: Detailed configuration of the device through accompanying software or mini programs. This includes setting measurement parameters, calibrating equipment, viewing real-time data, etc. Users need to follow the software prompts to gradually complete the configuration process.
Daily operation and maintenance
Start up and monitoring: After turning on the device, real-time monitoring of water level, flow rate, and other data can begin. Users can view monitoring results at any time through the accompanying software or mini program.
Regular maintenance: Regularly check the operation of the equipment, clean dust and debris, and ensure long-term stable operation of the equipment. At the same time, pay attention to waterproofing and moisture prevention to avoid damage to the equipment.
conclusion
Zhongke Blue Electric logarithmic radar flowmeter provides strong support for urban flood control work with the power of technology. Its simple usage, efficient monitoring performance, and stable operation have won the trust and praise of a large number of users. In the future, Zhongke Blue Electric will continue to uphold the spirit of innovation and bring more high-quality products and services to the field of water conservancy monitoring.